General Dynamics Electric Boat, the Connecticut subsidiary of Reston-based Fortune 500 defense contractor General Dynamics, has been awarded an up to $1.85 billion contract modification from the U.S.
The modification expands work under Lockheed’s existing Aegis Guam contract, which MDA originally awarded in December 2022.
Anduril has received a $100 million Space Force contract modification for space domain awareness mesh networking support.
Naval Technology on MSN
Raytheon wins $335m contract modification for Standard Missile-6
Work will be performed at multiple locations and is expected to be completed by 30 May 2030.
Reston-based Bechtel National has been awarded a $242.28 million contract modification from the U.S. Army to address past contract overruns associated with the Pueblo Chemical Agent-Destruction Pilot ...
Naval Technology on MSN
Lockheed Martin awarded contract modification for F-35 canopy tooling
The contract modification raises funding for extra F-35 canopy tooling, aiding the Navy, Marine Corps, Air Force and non-US ...
The Army awarded a modification to the Indefinite Delivery/Indefinite Quantity contract to Lockheed Martin Missiles and Fire Control on April 27, 2023 for full rate production for the Guided Multiple ...
The U.S. Department of War recently awarded a $670 million contract modification to Pratt & Whitney to work on F135 engines that power F-35 fighter jets. The contract modification was disclosed this ...
To continue reading this content, please enable JavaScript in your browser settings and refresh this page. Preview this article 1 min A local manufacturing plant has ...
Groton shipyard Electric Boat has been awarded a $642 million contract modification from the U.S. military to further support submarine production. The modification applies to a contract first awarded ...
Lockheed Martin (LMT) was awarded a $3.37B undefinitized modification to a previously awarded, cost-plus-fixed-fee, cost-plus-incentive-fee, fixed-price-incentive-fee, and firm-fixed-price contract.
Contractors frequently execute modifications for extra work without considering the impact the boilerplate broad release language in the modification may have on future claims. Government agencies ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results